Explore Other Data Centres:

Toronto Data Centre

Toronto Data Centres: Expanding to meet your needs

Technology is driving economy in 60+ CenturyLink data centres worldwide.

Toronto offers two facilities connected via a metro ring to provide clients with a wide range of solutions, from co-location to cloud and managed services. The Markham location is our newest Canadian data centre, and has 100,923 sq/ft of premium space that is Uptime Certified Tier III in both design and construction.

 

 

 

 

Announcements
CenturyLink reaches agreement to sell Co-Location and Data Centre business.

Take a Virtual Tour of our CH3 Data Centre

Data Centres

Toronto Data Centre Location

Location

TR1: Mississauga, Ontario

Space: 86,758 sf   Power: 6.6 MW

Tech Specs

TR1: Mississauga   Space: 86,758 sf   Power: 6.6 MW

Real Estate Summary

  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 83,758
  • Raised floor (inches) = 24 and 30

Electrical Summary

  • Enersource provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6.6 MW
  • Minimum one fuel replenishing company

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilises two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard

TR3: Markham, ON

Space: 100,923 sf Power: 5 MW

Tech Specs

TR3: Markham, ON   Space: 100,923 sf   Power: 5 MW

Real Estate Summary

  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 100,923

Electrical Summary

  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilises two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard

More Locations

Over 60 Data Centre Locations Worldwide

Latest from the EpiCenter Blog

Discussing the Data Centre of the Future

Michael Levy | March 13,2017

Many children grow up with toys you'd expect: bicycles, stuffed animals, dolls, building blocks, etc. It wouldn't be surprising to find a Magic-8 Ball in their arsenal that gives them ambiguous answers to the many seemingly important questions in childhood. … Read more…→ The post Discussing the Data Centre of the Future appeared first on CenturyLink EpiCenter Blog.

Operational Excellence: By the Book

David Meredith | March 07,2017

This article was previously published in Forbes Voice. Many large technology products come with a handbook when purchased. For example, if you buy a new large-screen television, the box in which it comes typically includes a handbook on how to … Read more…→ The post Operational Excellence: By the Book appeared first on CenturyLink EpiCenter Blog.

Operational Excellence: The Key to Safeguarding Your IT Infrastructure

Kelly Sullivan | March 01,2017

Technology can streamline mundane tasks, enable people to more easily keep in contact with family and friends around the world and allow TV shows and movies to be viewed almost anytime and anywhere. However, when it doesn't work correctly, it … Read more…→ The post Operational Excellence: The Key to Safeguarding Your IT Infrastructure appeared first on CenturyLink EpiCenter Blog.

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started
Request Consultation

Request Consultation

Call Us

Call Us

SALES: +65 6768 8098 
SUPPORT: +65 6768 8099

Get Connected. See What's Next for Business.